Be first to read the latest tech news, Industry Leader's Insights, and CIO interviews of medium and large enterprises exclusively from Construction Tech Review
Exploring the Geological Foundations of Underground Engineering
Geotechnical engineers conduct comprehensive risk assessments and develop maintenance plans to monitor and address any issues that may arise over the structure's lifespan.
By
Construction Tech Review | Thursday, September 18, 2025
Stay ahead of the industry with exclusive feature stories on
the top companies, expert insights and the latest news delivered straight to your
inbox. Subscribe today.
FREMONT, CA: For underground construction projects, geotechnical engineering is essential because it helps predict and understand how the ground will behave in different situations. Loose sand, silt, clay, and peat are examples of soft ground conditions that provide serious risks and call for cautious handling. Geotechnical studies, such as soil sampling, laboratory testing, and in-situ testing, offer important insights into the characteristics of soft ground, especially its susceptibility to severe stress distortion.
Parameters such as soil type, moisture content, density, and shear strength are essential for designing safe and effective construction methods. Accurate ground behavior prediction helps engineers choose appropriate construction techniques and materials, ensuring the stability and safety of underground structures. A critical aspect of underground construction in soft ground is the design of support systems to maintain stability during excavation. Unlike hard rock, soft ground cannot support itself and requires additional measures to prevent collapse. Geotechnical engineers design temporary and permanent support systems, like steel ribs, shotcrete, and slurry walls, to reinforce the excavation and surrounding ground.
The choice of support system depends on the soil's geotechnical properties, the excavation's depth and size, and the surrounding infrastructure. Proper design and installation of support systems are vital to prevent ground movement and ensure the safety of workers and nearby structures. Groundwater management is a significant concern in underground construction on soft ground. High groundwater levels can increase pore water pressure, reduce soil stability, and cause hydraulic heave or boiling during excavation. Effective dewatering and groundwater control strategies are essential to mitigate these risks. Geotechnical engineers assess groundwater conditions through site investigations and hydrological studies.
Proper groundwater management enhances soil stability and facilitates safer and more efficient construction operations. Settlement and ground movement are common issues in underground construction on soft ground. Excavation can cause soil displacement, leading to differential settlement and damage to adjacent structures. Geotechnical engineering plays a crucial role in predicting and mitigating these effects. Engineers can design measures to minimize ground movement by conducting detailed settlement analysis and monitoring. Monitoring systems, such as inclinometers and settlement plates, provide real-time data to ensure ground movement is within acceptable limits.
Ground improvement techniques are often necessary to enhance the properties of soft ground before construction. The methods aim to increase soil strength, reduce compressibility, and improve overall stability. Standard ground improvement techniques include soil compaction, jet grouting, mixing, and geosynthetics. Geotechnical engineers assess the suitability of various ground improvement methods based on the specific site conditions and project requirements. The ultimate goal of geotechnical engineering in underground construction is to ensure the long-term stability and safety of the structures. It involves addressing immediate construction challenges and considering the future performance of the underground space.